Eight missions, handled end to end
See how Certu's solutions work together across the services, from the first alert to the delivered result. Each scenario is illustrative.
Scenarios are illustrative. Certu is not affiliated with or endorsed by the Department of Defense or any service.
Supplying a large installation every day
The installation's Logistics Readiness Center supplies dining facilities, motor pools, clinics and units across an Army installation, every day.
On top of 60 regular delivery points, each with its own delivery window and access times.
Moving a scheduled delivery to a different day needs sign-off from the receiving activity. Certu asks them directly.
Illustrative example. Times, quantities and outcomes shown are not from a deployment.
- 1
Forecasts each delivery point
Sets each point's daily need from real consumption, including the exercise surge.
- 2
Prepares the waves
Builds pick waves by route at the Supply Support Activity, so each truck is loaded in delivery order.
- 3
Plans the day
Builds routes and driver schedules for the Transportation Motor Pool against every delivery window and access time.
- 4
Flags a late vendor
A vendor delivery to the Supply Support Activity will arrive 3 hours late. Certu alerts within a minute and shows which afternoon deliveries depend on it.
- 5
Rebuilds the afternoon
Resequences the afternoon routes so the affected stops come last, and asks one activity to accept a later window.
- ✓
Every point supplied
The exercise and the regular delivery points are both covered, and the Logistics Readiness Center's planners spent the morning on decisions instead of rework.
A unit mobilizes on short notice
A Reserve or Guard unit is ordered to mobilize, and the mobilization force generation installation has to scale up its supply plan fast.
Equipment, supplies and consumables must reach the installation before they do, on top of normal demand.
Replenishment requisitions above a limit you set need sign-off from the installation's Logistics Readiness Center or supporting G-4. Everything else proceeds automatically.
Illustrative example. Times, quantities and outcomes shown are not from a deployment.
- 1
Brings it into one picture
Combines the unit's personnel roster and equipment authorizations (MTOE) with on-hand inventory and open requisitions, and shows what is missing.
- 2
Sizes the surge
Turns unit size and duration into a day-by-day supply requirement, and raises replenishment requests for what will run short.
- 3
Stages by priority
Rearranges staging and pick waves by unit and required delivery date, so the first items needed ship first.
- 4
Builds the movement plan
Plans loads, routes and delivery schedules to the installation, sequenced against the unit's reporting date and validation timeline.
- 5
Handles the breakdown
Two trucks become unavailable. Certu alerts within a minute, reassigns their loads to other vehicles and keeps the delivery dates.
- ✓
Ready before the unit arrives
Every load is delivered by day 9, without adding planners to the surge.
The supply line moves with the force
In a deployment, the plan changes as the situation changes. Units relocate on short notice, and a supply route can become unusable overnight.
Enemy activity makes the route unusable. Resupply planned for the next 72 hours was built around the old locations and the old route.
Routes, supply points and priorities are set by operations. Certu works within them, and every change to resupply priorities or supply points waits for the commander's approval.
Illustrative example. Times, quantities and outcomes shown are not from a deployment.
- 1
Intakes and processes the data
Receives the new unit locations and the route closure, and shows every planned delivery, convoy and supply point affected.
- 2
Recalculates demand
Updates each unit's expected consumption of fuel (Class III), ammunition (Class V) and repair parts (Class IX) for the new positions and operating tempo, so resupply matches what will actually be used.
- 3
Recommends a new resupply plan
Proposes serving the forward units from an alternate supply point on an open route, ranks deliveries by mission priority, and sends the plan to the support operations officer for the commander's approval.
- 4
Re-prioritizes the supply points
Moves the highest-priority items to the front of the queue at the alternate supply point and rebalances stock between supply points.
- 5
Rebuilds the movement plan
Builds new convoy loads, routes and timings on the routes operations has cleared, avoiding the closed route entirely.
- 6
Refills the pipeline at home
Raises replenishment requests at the supporting depot to replace what the forward units will now use faster.
- ✓
Resupply keeps up with the move
The forward units are resupplied on the new routes, the plan keeps adjusting as positions change, and every decision is recorded with who approved it.
An aircraft waits on a part
A maintenance squadron cannot return an aircraft to service until a replacement part arrives.
The aircraft is now a MICAP. A serviceable part is on hand at another base's Logistics Readiness Squadron 150 miles away, in a different plan.
Transfers of controlled items between sites need sign-off from the materiel management flight. Certu prepares everything, then waits for that one click.
Illustrative example. Times, quantities and outcomes shown are not from a deployment.
- 1
Detects the delay
Sees the new date from the source of supply, links it to the open maintenance work order and alerts the maintenance and supply teams.
- 2
Recommends a decision
Compares waiting for the source of supply with requesting lateral support from the other base, and sends the recommendation to the materiel management flight for approval.
- 3
Reserves the part
Once approved, reserves the part at the other warehouse and puts a priority pick at the top of the queue.
- 4
Plans the expedited move
Builds the shipment and route, assigns an available vehicle and calculates the arrival time at the maintenance hangar.
- 5
Guards against the next one
Notes that this part is being used faster than planned and recommends higher stockage levels at both sites.
- ✓
Part arrives the same day
The aircraft returns to service 2 days sooner. The transfer, the approval and the reason are recorded.
A ship's maintenance availability at risk
Parts from many suppliers must arrive before each work package starts. One late component can hold up the whole schedule.
It is one of 14 suppliers feeding the availability, and its work package starts next week.
Resequencing work packages needs sign-off from the maintenance planner. Certu presents the options and their impact.
Illustrative example. Times, quantities and outcomes shown are not from a deployment.
- 1
Detects the delay
Picks up the supplier's new date and identifies the work package and the jobs that depend on it.
- 2
Recommends a new sequence
Proposes moving forward work packages whose parts are already in, so crews stay busy, and sends it to the maintenance planner.
- 3
Re-kits the parts
Re-kits parts on hand to match the new work-package order.
- 4
Reschedules pier deliveries
Moves deliveries to the pier to match the new sequence and the available delivery windows.
- 5
Expedites the late part
Plans the fastest move from the supplier to the shipyard the moment the component is ready.
- ✓
The schedule holds
Crews keep working on other packages, and the delayed job starts as soon as its part arrives. The decision and the reason are recorded.
The underway date moves up two days
A Marine unit is preparing to embark. Equipment and supplies must reach the port and be loaded in the right order before the ship gets underway.
120 loads still have to leave the base, reach the port and be staged in loading sequence.
Changes to the load sequence need sign-off from the embarkation officer. Certu proposes the new sequence and shows what moves.
Illustrative example. Times, quantities and outcomes shown are not from a deployment.
- 1
Sees the new date
Picks up the earlier underway date, lists every load that would now arrive too late and alerts the logistics team.
- 2
Proposes a new sequence
Rebuilds the load sequence around the new date, keeping items needed first ashore at the right place in the ship, and sends it to the embarkation officer.
- 3
Restages the marshalling area
Re-orders picking and staging on base so loads leave in the new sequence.
- 4
Compresses the move to port
Rebuilds truck schedules from base to port to fit the shorter window and the port's gate times, and flags any loads organic trucks cannot cover in time.
- ✓
Loaded in sequence, on the new date
Every load reaches the port in loading order before the earlier underway date. The approved sequence is recorded.
A hurricane is three days out
Relief supplies for Defense Support of Civil Authorities (DSCA) must be in place before landfall, and the plan will change once the storm hits.
Water, generators and shelter supplies need to reach 4 staging areas, and then the communities they serve.
Changing the priority order between staging areas needs sign-off from the Joint Task Force J3 or operations officer. Certu proposes; the officer decides.
Illustrative example. Times, quantities and outcomes shown are not from a deployment.
- 1
Estimates the need
Estimates supplies needed for each staging area from the population each one serves.
- 2
Picks priority items first
Stages the warehouse by destination and priority, so the most critical supplies leave first.
- 3
Pre-positions
Plans moves to all 4 staging areas to finish well before landfall, and flags any loads that organic vehicles cannot carry in time.
- 4
Catches the closure
A bridge on a planned route closes. Certu alerts within a minute and lists every delivery affected.
- 5
Reroutes
Rebuilds the routes around the closure and proposes a new delivery order for the officer to approve.
- ✓
Supplies keep moving
Staging areas are stocked before landfall, and deliveries continue around the closure with every change recorded.
One picture, with Smart Alerts
Every change from every system flows into Certu Intelligence: requirements, maintenance, stock, transport, suppliers and the operational picture. It links them, finds what puts the mission at risk, and turns it into a Smart Alert with a recommended decision.
Certu Intelligence
3 vehicles will miss the exercise
Their repair part arrives Thursday. The exercise starts Wednesday.
Transfer the parts from the depot today. All 3 vehicles are repaired by Tuesday.
Illustrative example. Times, quantities and outcomes are not from a deployment.
Ready-made alerts, plus custom alerts for your mission, your units and your rules.
Run your own scenario.
A Shadow Simulation replays your historical data through Certu and shows what it would have done. Results in 2+ weeks.