A depot connected by planned routes to an airfield, a carrier group and a combat unit, with the Certu logo as Certu Intelligence at the center, a route-closed alert and an approval request.
Defense Scenarios

Eight missions, handled end to end

How Certu's solutions work together when something changes, across the services. Each scenario is illustrative.

Scenario 1 · Air Force

An aircraft waits on a part

A maintenance squadron cannot return an aircraft to service until a replacement part arrives.

06:10
The supplier pushes the part back 2 days.

The aircraft is grounded until it arrives. Serviceable stock exists at another base warehouse 150 miles away, but no one has connected the two.

Approval where you require it

Transfers of controlled items between sites need sign-off from the supply officer. Certu prepares everything, then waits for that one click.

Amber values are illustrative.

  1. 1
    Within 1 minCertu Intelligence

    Detects the delay

    Sees the supplier's new date, links it to the open maintenance work order and alerts the maintenance and supply teams.

  2. 2
    +2 minCertu Operations OS

    Recommends a decision

    Compares waiting for the supplier with transferring stock from the other base, and sends the recommended transfer to the supply officer for approval.

  3. 3
    +4 minCertu WMS

    Reserves the part

    Once approved, reserves the part at the other warehouse and puts a priority pick at the top of the queue.

  4. 4
    +6 minCertu LOaaS

    Plans the expedited move

    Builds the shipment and route, assigns the first available vehicle and calculates the arrival time at the maintenance hangar.

  5. 5
    Same dayCertu AI Predictor

    Prevents the next one

    Notes that this part is being used faster than planned and raises its reorder levels at both sites.

  6. ✓

    Part arrives the same day

    The aircraft returns to service 2 days sooner. The transfer, the approval and the reason are recorded.

Scenario 2 · Army Reserve and National Guard

A unit mobilizes on short notice

A Reserve or Guard unit receives orders to report to a mobilization site, and the supply plan has to scale up fast.

Day 0
600 personnel report in 10 days.

Equipment, supplies and consumables must reach the mobilization site before they do, on top of normal demand.

Approval where you require it

Commercial transport spend above $25,000 needs sign-off from the logistics officer. Everything else proceeds automatically.

Amber values are illustrative.

  1. 1
    Day 0Certu Operations OS

    Brings it into one picture

    Combines the unit's personnel and equipment lists with stock on hand and open orders, and shows what is missing.

  2. 2
    Day 0Certu AI Predictor

    Sizes the surge

    Turns unit size and duration into a day-by-day supply requirement, and starts replenishment for what will run short.

  3. 3
    Day 1Certu WMS

    Stages by priority

    Rearranges staging and pick waves by unit and required delivery date, so the first items needed ship first.

  4. 4
    Day 1Certu LOaaS

    Builds the movement plan

    Plans loads, routes and delivery schedules to the mobilization site, sequenced against the reporting date.

  5. 5
    Day 4Certu Intelligence

    Handles the breakdown

    Two trucks become unavailable. Certu alerts within a minute, reassigns their loads to other vehicles and keeps the delivery dates.

  6. ✓

    Ready before the unit arrives

    Every load is delivered by day 9, without adding planners to the surge.

Scenario 3 · National Guard and Coast Guard

A hurricane is three days out

Relief supplies must be in place before landfall, and the plan will change once the storm hits.

72 h
The forecast puts landfall in 3 days.

Water, generators and shelter supplies need to reach 4 staging areas, and then the communities they serve.

Approval where you require it

Changing the priority order between staging areas needs sign-off from the operations officer. Certu proposes; the officer decides.

Amber values are illustrative.

  1. 1
    72 hCertu AI Predictor

    Estimates the need

    Estimates supplies needed for each staging area from the population each one serves.

  2. 2
    70 hCertu WMS

    Picks priority items first

    Stages the warehouse by destination and priority, so the most critical supplies leave first.

  3. 3
    68 hCertu LOaaS

    Pre-positions

    Plans moves to all 4 staging areas to finish well before landfall.

  4. 4
    After landfallCertu Intelligence

    Catches the closure

    A bridge on a planned route closes. Certu alerts within a minute and lists every delivery affected.

  5. 5
    +5 minCertu LOaaS

    Reroutes

    Rebuilds the routes around the closure and proposes a new delivery order for the officer to approve.

  6. ✓

    Supplies keep moving

    Staging areas are stocked before landfall, and deliveries continue around the closure with every change recorded.

Scenario 4 · Army installations

Supplying a large installation every day

A central warehouse supplies dining facilities, motor pools, clinics and units across an Army installation, every day.

Mon
A field exercise doubles demand at the training area this week.

On top of 60 regular delivery points, each with its own delivery window and access times.

Approval where you require it

Moving a scheduled delivery to a different day needs sign-off from the receiving activity. Certu asks them directly.

Amber values are illustrative.

  1. 1
    Sun nightCertu AI Predictor

    Forecasts each delivery point

    Sets each point's daily need from real consumption, including the exercise surge.

  2. 2
    OvernightCertu WMS

    Prepares the waves

    Builds pick waves by route, so each truck is loaded in delivery order.

  3. 3
    05:00Certu LOaaS

    Plans the day

    Builds routes and driver schedules for the installation's trucks against every delivery window and access time.

  4. 4
    10:20Certu Intelligence

    Flags a late vendor

    A vendor delivery to the warehouse will arrive 3 hours late. Certu alerts within a minute and shows which afternoon deliveries depend on it.

  5. 5
    +4 minCertu LOaaS

    Rebuilds the afternoon

    Resequences the afternoon routes so the affected stops come last, and asks one activity to accept a later window.

  6. ✓

    Every point supplied

    The exercise and the regular delivery points are both covered, and planners spent the morning on decisions instead of rework.

Scenario 5 · Marine Corps

Sailing moves up two days

A Marine unit is preparing to embark. Equipment and supplies must reach the port and be loaded in the right order before the ship sails.

T-5 days
The sailing date moves up 48 hours.

120 loads still have to leave the base, reach the port and be staged in loading sequence.

Approval where you require it

Changes to the load sequence need sign-off from the embarkation officer. Certu proposes the new sequence and shows what moves.

Amber values are illustrative.

  1. 1
    Within 1 minCertu Intelligence

    Sees the new date

    Picks up the earlier sailing, lists every load that would now arrive too late and alerts the logistics team.

  2. 2
    +3 minCertu Operations OS

    Proposes a new sequence

    Rebuilds the load sequence around the new date, keeping items needed first ashore at the right place in the ship, and sends it to the embarkation officer.

  3. 3
    +10 minCertu WMS

    Restages the warehouse

    Re-orders picking and staging on base so loads leave in the new sequence.

  4. 4
    +15 minCertu LOaaS

    Compresses the move to port

    Rebuilds truck schedules from base to port to fit the shorter window and the port's gate times.

  5. ✓

    Loaded in sequence, on the new date

    Every load reaches the port in loading order before the earlier sailing. The approved sequence is recorded.

Scenario 6 · Navy

A ship's maintenance period at risk

Parts from many suppliers must arrive before each work package starts. One late component can hold up the whole schedule.

Day 12
A supplier's component will be 5 days late.

It is one of 14 suppliers feeding the maintenance period, and its work package starts next week.

Approval where you require it

Resequencing work packages needs sign-off from the maintenance planner. Certu presents the options and their impact.

Amber values are illustrative.

  1. 1
    Within 1 minCertu Intelligence

    Detects the delay

    Picks up the supplier's new date and identifies the work package and the jobs that depend on it.

  2. 2
    +3 minCertu Operations OS

    Recommends a new sequence

    Proposes moving forward work packages whose parts are already in, so crews stay busy, and sends it to the maintenance planner.

  3. 3
    +5 minCertu WMS

    Re-kits the parts

    Re-kits parts on hand to match the new work-package order.

  4. 4
    +7 minCertu LOaaS

    Reschedules pier deliveries

    Moves deliveries to the pier to match the new sequence and the available delivery windows.

  5. 5
    Ready dateCertu LOaaS

    Expedites the late part

    Plans the fastest move from the supplier to the shipyard the moment the component is ready.

  6. ✓

    The schedule holds

    Crews keep working on other packages, and the delayed job starts as soon as its part arrives. The decision and the reason are recorded.

Scenario 7 · Deployed forces

The supply line moves with the force

In a deployment, the plan changes as the situation changes. Units relocate on short notice, and a supply route can become unusable overnight.

02:00
Operations moves 2 units forward and closes the main supply route.

Enemy activity makes the route unusable. Resupply planned for the next 72 hours was built around the old locations and the old route.

Command stays in control

Routes, supply points and priorities are set by operations. Certu works within them, and every change to resupply priorities or supply points waits for the logistics commander's approval.

Amber values are illustrative.

  1. 1
    Within 1 minCertu Intelligence

    Intakes and processes the data

    Receives the new unit locations and the route closure, and shows every planned delivery, convoy and supply point affected.

  2. 2
    +2 minCertu AI Predictor

    Recalculates demand

    Updates each unit's expected consumption for the new positions and operating tempo, so resupply matches what will actually be used.

  3. 3
    +5 minCertu Operations OS

    Recommends a new resupply plan

    Proposes serving the forward units from an alternate supply point on an open route, ranks deliveries by mission priority, and sends the plan to the logistics commander.

  4. 4
    On approvalCertu WMS

    Re-prioritizes the supply points

    Moves the highest-priority items to the front of the queue at the alternate supply point and rebalances stock between supply points.

  5. 5
    +10 minCertu LOaaS

    Rebuilds the movement plan

    Builds new convoy loads, routes and timings on the routes operations has cleared, avoiding the closed route entirely.

  6. 6
    Same dayCertu AI Predictor

    Refills the pipeline at home

    Raises replenishment at the home-station depot to replace what the forward units will now use faster.

  7. ✓

    Resupply keeps up with the move

    The forward units are resupplied on the new routes, the plan keeps adjusting as positions change, and every decision is recorded with who approved it.

Scenario 8 · Every service

One picture, with Smart Alerts

Every change from every system flows into Certu Intelligence: requirements, maintenance, stock, transport, suppliers and the operational picture. It links them, finds what puts the mission at risk, and turns it into a Smart Alert with a recommended decision.

Every change, as it happens
Requirements and prioritiesNew requests, changed priorities, required delivery dates
Maintenance and readinessWork orders, parts on order, equipment status
Stock and warehousesOn hand, reserved and in transit, at every site
Transport and suppliersVehicle status, carrier updates, supplier dates
Operational changesUnit locations, route status, schedule changes

Certu Intelligence

1
Intakes every changeUpdates one live model of the whole operation within a minute.
2
Links what no single system seesA part, a work order and an exercise date, connected into one risk.
3
Recommends a decisionThe option that protects readiness, within your constraints.
4
Acts within parameters. Enables commanders’ decisions.Anything outside your parameters goes to the commander with authority to decide.
Outcome
Plans updated everywhereWarehouses, vehicles, carriers and units work from the same new plan.
Readiness protectedProblems are handled before they reach the mission.
Every decision recordedWhat changed, who approved it and why.

Illustrative example.

Across the whole operation
Readiness · CriticalAircraft grounded waiting on a part
Supply · CriticalA supply point runs out of a priority item in 2 days
Transport · WarningA route closure affects 6 deliveries
Supplier · WarningA supplier is late on 2 of 3 orders
Demand · WarningConsumption up 30% since the unit moved
And many more

Ready-made alerts, plus custom alerts for your mission, your units and your rules.

Get started

Run your own scenario.

A Shadow Simulation replays your historical data through Certu and shows what it would have done. Results in 2 weeks.