# Military Sustainment | Certu Systems

> Plan materiel movement from requirement to point of need, and replan within minutes, for active and Reserve components.

Source: https://certusystems.com/defense/sustainment/

*Image: A distribution point with planned routes to delivery points, and trucks on the way.*

[Defense](https://certusystems.com/defense/) Military sustainment · Installations and depots

# Sustainment that keeps up with the mission

Certu plans materiel movement from requirement to point of need, replans within minutes when something changes, and keeps your approvers in control of the decisions that matter.

[Request a Shadow Simulation](https://certusystems.com/defense/work-with-us/#defense-form)

What changes

## From reconciling to deciding

Certu brings requirements, stock, transportation and cost into one live plan, so your logisticians spend their time on decisions, not on rebuilding spreadsheets.

01

### Requirement to delivery in one plan

Inventory positions, loads, routes and transportation assets are decided together, so a change in one updates the rest.

02

### Replanned in minutes

When a delivery slips, a vehicle is unavailable or a priority changes, Certu rebuilds the plan and shows exactly what moved.

03

### Approval at your thresholds

Decisions above the limits you set, such as priority changes or cost, wait for sign-off from the right person. Every decision is logged.

04

### Ready for surges

Mobilizations, exercises and training cycles create demand on short notice. Certu replans for the surge without adding planners.

05

### Stock where it is needed

Certu AI Predictor sets replenishment from real demand, and Certu WMS keeps inventory positions current at each depot and supply activity.

06

### Cost accountability

Every shipment's cost is known when it delivers, so resource managers see obligations as they happen, not weeks later.

Example

## A critical part is delayed

How Certu handles a disruption, step by step.

Minute 1 · Detect

### Alert raised

A repair part for a maintenance unit misses its connection at the depot. Certu flags it and shows every requisition and work order that depends on it.

Minutes 2–5 · Replan

### New plan built

Certu finds the part at another location, rebuilds the load and route, and works out the new arrival time and cost.

Approve

### Your call

The cost is above the threshold you set, so the plan waits for one click from the approving officer.

Act

### Everyone informed

The transportation provider, the supply activity and the receiving unit get the new plan. The decision and who made it are recorded.

Illustrative example.

Every service

## Active and Reserve components

For installation, depot and unit logistics across the Army, Navy, Air Force, Marine Corps, Space Force and Coast Guard, including the Reserves and the National Guard, where mobilization and training cycles drive sudden changes in demand.

Army Navy Air Force Marine Corps Space Force Coast Guard Reserve components National Guard

Get started

## See it on your own data.

A Shadow Simulation runs Certu on your historical requisitions and movements alongside current operations. Results in 2+ weeks. Nothing live changes.

[Request a Shadow Simulation](https://certusystems.com/defense/work-with-us/#defense-form)[Security and compliance](https://certusystems.com/defense/security/)
