# Defense Scenarios | Certu Systems

> Eight illustrative missions handled end to end, from aircraft maintenance and mobilization to deployed resupply and a common logistics picture with Smart Alerts.

Source: https://certusystems.com/defense/scenarios/

*Image: A depot connected by planned routes to an airfield, a carrier group and a combat unit, with the Certu logo as Certu Intelligence at the center, a route-closed alert and an approval request.*

[Defense](https://certusystems.com/defense/) Scenarios

# Eight missions, handled end to end

See how Certu's solutions work together across the services, from the first alert to the delivered result. Each scenario is illustrative.

[Request a Shadow Simulation](https://certusystems.com/defense/work-with-us/#defense-form)

- [1 · Army Supplying a large installation every day Many delivery points, planned daily, replanned as the day changes.](https://certusystems.com/defense/scenarios/#installation)
- [2 · Army Reserve and National Guard A unit mobilizes on short notice Mobilization orders arrive, requirements surge, staging and movement adapt.](https://certusystems.com/defense/scenarios/#mobilization)
- [3 · Deployed forces The supply line moves with the force Units relocate, a route closes, resupply adjusts.](https://certusystems.com/defense/scenarios/#deployed)
- [4 · Air Force An aircraft waits on a part A part slips, stock moves from another base, the aircraft returns sooner.](https://certusystems.com/defense/scenarios/#aircraft)
- [5 · Navy A ship's maintenance availability at risk Suppliers slip, work packages shift, pier deliveries follow.](https://certusystems.com/defense/scenarios/#shipyard)
- [6 · Marine Corps The underway date moves up two days The date moves up, staging and loading resequence.](https://certusystems.com/defense/scenarios/#embarkation)
- [7 · National Guard and Coast Guard A hurricane is three days out The storm shifts, supplies move early, routes adjust.](https://certusystems.com/defense/scenarios/#hurricane)
- [8 · Every service One picture, with Smart Alerts Every change flows into Certu Intelligence.](https://certusystems.com/defense/scenarios/#common-picture)

Scenarios are illustrative. Certu is not affiliated with or endorsed by the Department of Defense or any service.

Scenario 1 · Army

## Supplying a large installation every day

The installation's Logistics Readiness Center supplies dining facilities, motor pools, clinics and units across an Army installation, every day.

Mon

**A field exercise doubles demand at the training area this week.**

On top of 60 regular delivery points, each with its own delivery window and access times.

**Approval where you require it**

Moving a scheduled delivery to a different day needs sign-off from the receiving activity. Certu asks them directly.

Illustrative example. Times, quantities and outcomes shown are not from a deployment.

- 1

Sun night Certu AI Predictor

### Forecasts each delivery point

Sets each point's daily need from real consumption, including the exercise surge.

- 2

Overnight Certu WMS

### Prepares the waves

Builds pick waves by route at the Supply Support Activity, so each truck is loaded in delivery order.

- 3

05:00 Certu LOaaS

### Plans the day

Builds routes and driver schedules for the Transportation Motor Pool against every delivery window and access time.

- 4

10:20 Certu Intelligence

### Flags a late vendor

A vendor delivery to the Supply Support Activity will arrive 3 hours late. Certu alerts within a minute and shows which afternoon deliveries depend on it.

- 5

+4 min Certu LOaaS

### Rebuilds the afternoon

Resequences the afternoon routes so the affected stops come last, and asks one activity to accept a later window.

- ✓

### Every point supplied

The exercise and the regular delivery points are both covered, and the Logistics Readiness Center's planners spent the morning on decisions instead of rework.

Scenario 2 · Army Reserve and National Guard

## A unit mobilizes on short notice

A Reserve or Guard unit is ordered to mobilize, and the mobilization force generation installation has to scale up its supply plan fast.

Day 0

**600 Soldiers report in 10 days.**

Equipment, supplies and consumables must reach the installation before they do, on top of normal demand.

**Approval where you require it**

Replenishment requisitions above a limit you set need sign-off from the installation's Logistics Readiness Center or supporting G-4. Everything else proceeds automatically.

Illustrative example. Times, quantities and outcomes shown are not from a deployment.

- 1

Day 0 Certu Operations OS

### Brings it into one picture

Combines the unit's personnel roster and equipment authorizations (MTOE) with on-hand inventory and open requisitions, and shows what is missing.

- 2

Day 0 Certu AI Predictor

### Sizes the surge

Turns unit size and duration into a day-by-day supply requirement, and raises replenishment requests for what will run short.

- 3

Day 1 Certu WMS

### Stages by priority

Rearranges staging and pick waves by unit and required delivery date, so the first items needed ship first.

- 4

Day 1 Certu LOaaS

### Builds the movement plan

Plans loads, routes and delivery schedules to the installation, sequenced against the unit's reporting date and validation timeline.

- 5

Day 4 Certu Intelligence

### Handles the breakdown

Two trucks become unavailable. Certu alerts within a minute, reassigns their loads to other vehicles and keeps the delivery dates.

- ✓

### Ready before the unit arrives

Every load is delivered by day 9, without adding planners to the surge.

Scenario 3 · Deployed forces

## The supply line moves with the force

In a deployment, the plan changes as the situation changes. Units relocate on short notice, and a supply route can become unusable overnight.

02:00

**Operations moves 2 units forward and closes the main supply route.**

Enemy activity makes the route unusable. Resupply planned for the next 72 hours was built around the old locations and the old route.

**Command stays in control**

Routes, supply points and priorities are set by operations. Certu works within them, and every change to resupply priorities or supply points waits for the commander's approval.

Illustrative example. Times, quantities and outcomes shown are not from a deployment.

- 1

Within 1 min Certu Intelligence

### Intakes and processes the data

Receives the new unit locations and the route closure, and shows every planned delivery, convoy and supply point affected.

- 2

+2 min Certu AI Predictor

### Recalculates demand

Updates each unit's expected consumption of fuel (Class III), ammunition (Class V) and repair parts (Class IX) for the new positions and operating tempo, so resupply matches what will actually be used.

- 3

+5 min Certu Operations OS

### Recommends a new resupply plan

Proposes serving the forward units from an alternate supply point on an open route, ranks deliveries by mission priority, and sends the plan to the support operations officer for the commander's approval.

- 4

On approval Certu WMS

### Re-prioritizes the supply points

Moves the highest-priority items to the front of the queue at the alternate supply point and rebalances stock between supply points.

- 5

+10 min Certu LOaaS

### Rebuilds the movement plan

Builds new convoy loads, routes and timings on the routes operations has cleared, avoiding the closed route entirely.

- 6

Same day Certu AI Predictor

### Refills the pipeline at home

Raises replenishment requests at the supporting depot to replace what the forward units will now use faster.

- ✓

### Resupply keeps up with the move

The forward units are resupplied on the new routes, the plan keeps adjusting as positions change, and every decision is recorded with who approved it.

Scenario 4 · Air Force

## An aircraft waits on a part

A maintenance squadron cannot return an aircraft to service until a replacement part arrives.

06:10

**The source of supply pushes the part back 2 days.**

The aircraft is now a MICAP. A serviceable part is on hand at another base's Logistics Readiness Squadron 150 miles away, in a different plan.

**Approval where you require it**

Transfers of controlled items between sites need sign-off from the materiel management flight. Certu prepares everything, then waits for that one click.

Illustrative example. Times, quantities and outcomes shown are not from a deployment.

- 1

Within 1 min Certu Intelligence

### Detects the delay

Sees the new date from the source of supply, links it to the open maintenance work order and alerts the maintenance and supply teams.

- 2

+2 min Certu Operations OS

### Recommends a decision

Compares waiting for the source of supply with requesting lateral support from the other base, and sends the recommendation to the materiel management flight for approval.

- 3

+4 min Certu WMS

### Reserves the part

Once approved, reserves the part at the other warehouse and puts a priority pick at the top of the queue.

- 4

+6 min Certu LOaaS

### Plans the expedited move

Builds the shipment and route, assigns an available vehicle and calculates the arrival time at the maintenance hangar.

- 5

Same day Certu AI Predictor

### Guards against the next one

Notes that this part is being used faster than planned and recommends higher stockage levels at both sites.

- ✓

### Part arrives the same day

The aircraft returns to service 2 days sooner. The transfer, the approval and the reason are recorded.

Scenario 5 · Navy

## A ship's maintenance availability at risk

Parts from many suppliers must arrive before each work package starts. One late component can hold up the whole schedule.

Day 12

**A supplier's component will be 5 days late.**

It is one of 14 suppliers feeding the availability, and its work package starts next week.

**Approval where you require it**

Resequencing work packages needs sign-off from the maintenance planner. Certu presents the options and their impact.

Illustrative example. Times, quantities and outcomes shown are not from a deployment.

- 1

Within 1 min Certu Intelligence

### Detects the delay

Picks up the supplier's new date and identifies the work package and the jobs that depend on it.

- 2

+3 min Certu Operations OS

### Recommends a new sequence

Proposes moving forward work packages whose parts are already in, so crews stay busy, and sends it to the maintenance planner.

- 3

+5 min Certu WMS

### Re-kits the parts

Re-kits parts on hand to match the new work-package order.

- 4

+7 min Certu LOaaS

### Reschedules pier deliveries

Moves deliveries to the pier to match the new sequence and the available delivery windows.

- 5

Ready date Certu LOaaS

### Expedites the late part

Plans the fastest move from the supplier to the shipyard the moment the component is ready.

- ✓

### The schedule holds

Crews keep working on other packages, and the delayed job starts as soon as its part arrives. The decision and the reason are recorded.

Scenario 6 · Marine Corps

## The underway date moves up two days

A Marine unit is preparing to embark. Equipment and supplies must reach the port and be loaded in the right order before the ship gets underway.

T-5 days

**The underway date moves up 48 hours, leaving 3 days.**

120 loads still have to leave the base, reach the port and be staged in loading sequence.

**Approval where you require it**

Changes to the load sequence need sign-off from the embarkation officer. Certu proposes the new sequence and shows what moves.

Illustrative example. Times, quantities and outcomes shown are not from a deployment.

- 1

Within 1 min Certu Intelligence

### Sees the new date

Picks up the earlier underway date, lists every load that would now arrive too late and alerts the logistics team.

- 2

+3 min Certu Operations OS

### Proposes a new sequence

Rebuilds the load sequence around the new date, keeping items needed first ashore at the right place in the ship, and sends it to the embarkation officer.

- 3

+10 min Certu WMS

### Restages the marshalling area

Re-orders picking and staging on base so loads leave in the new sequence.

- 4

+15 min Certu LOaaS

### Compresses the move to port

Rebuilds truck schedules from base to port to fit the shorter window and the port's gate times, and flags any loads organic trucks cannot cover in time.

- ✓

### Loaded in sequence, on the new date

Every load reaches the port in loading order before the earlier underway date. The approved sequence is recorded.

Scenario 7 · National Guard and Coast Guard

## A hurricane is three days out

Relief supplies for Defense Support of Civil Authorities (DSCA) must be in place before landfall, and the plan will change once the storm hits.

72 h

**The forecast puts landfall in 3 days.**

Water, generators and shelter supplies need to reach 4 staging areas, and then the communities they serve.

**Approval where you require it**

Changing the priority order between staging areas needs sign-off from the Joint Task Force J3 or operations officer. Certu proposes; the officer decides.

Illustrative example. Times, quantities and outcomes shown are not from a deployment.

- 1

72 h Certu AI Predictor

### Estimates the need

Estimates supplies needed for each staging area from the population each one serves.

- 2

70 h Certu WMS

### Picks priority items first

Stages the warehouse by destination and priority, so the most critical supplies leave first.

- 3

68 h Certu LOaaS

### Pre-positions

Plans moves to all 4 staging areas to finish well before landfall, and flags any loads that organic vehicles cannot carry in time.

- 4

After landfall Certu Intelligence

### Catches the closure

A bridge on a planned route closes. Certu alerts within a minute and lists every delivery affected.

- 5

+5 min Certu LOaaS

### Reroutes

Rebuilds the routes around the closure and proposes a new delivery order for the officer to approve.

- ✓

### Supplies keep moving

Staging areas are stocked before landfall, and deliveries continue around the closure with every change recorded.

Scenario 8 · Every service

## One picture, with Smart Alerts

Every change from every system flows into Certu Intelligence: requirements, maintenance, stock, transport, suppliers and the operational picture. It links them, finds what puts the mission at risk, and turns it into a Smart Alert with a recommended decision.

Every change, as it happens

**Requirements and priorities**New requests, changed priorities, required delivery dates

**Maintenance and readiness**Work orders, parts on order, equipment status

**Stock and warehouses**On hand, reserved and in transit, at every site

**Transport and suppliers**Vehicle status, carrier updates, supplier dates

**Operational changes**Unit locations, route status, schedule changes

### Certu Intelligence

1

**Intakes every change**Updates one live model of the whole operation within a minute of receiving it.

2

**Links what separate systems don't show**A part, a work order and an exercise date, connected into one risk.

3

**Recommends a decision**The option that protects readiness, within your constraints.

4

**Acts within your parameters**Anything outside them goes to the commander with authority to decide.

Outcome

**Plans updated everywhere**Warehouses, vehicles, carriers and units work from the same new plan.

**Readiness protected**Problems are handled before they reach the mission.

**Every decision recorded**What changed, who approved it and why.

Critical Found by linking maintenance, stock and the training schedule

### 3 vehicles will miss the exercise

Their repair part arrives Thursday. The exercise starts Wednesday.

**3**vehicles not mission capable

**1 day**short of the start date

**2 sites**with the part in stock

Recommended decision

Transfer the parts from the depot today. All 3 vehicles are repaired by Tuesday.

Approve DeclineApprove: the transfer is booked and maintenance is told.

Illustrative example. Times, quantities and outcomes are not from a deployment.

Across the whole operation

Readiness · Critical**Aircraft grounded waiting on a part**

Supply · Critical**A supply point runs out of a priority item in 2 days**

Transport · Warning**A route closure affects 6 deliveries**

Supplier · Warning**A supplier is late on 2 of 3 orders**

Demand · Warning**Consumption up 30% since the unit movedAnd many more**

Ready-made alerts, plus custom alerts for your mission, your units and your rules.

Get started

## Run your own scenario.

A Shadow Simulation replays your historical data through Certu and shows what it would have done. Results in 2+ weeks.

[Request a Shadow Simulation](https://certusystems.com/defense/work-with-us/#defense-form)[Defense solutions](https://certusystems.com/defense/solutions/)
